<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Publication:
A robust optimization approach for production planning under exogenous planned lead times

Loading...
Thumbnail Image

Institution Authors

Item type:Person,
ALBEY, Erinç
Item type:Person,

Organizational Units

Item type:Organizational Unit,

Research Projects

Advisor

item.page.editor

Editor

Journal Title

Journal ISSN

Volume Title

Publication Status

Published

Journal Issue

Abstract

Many production planning models applied in semiconductor manufacturing represent lead times as fixed exogenous parameters. However, in reality, lead times must be treated as realizations of released lots' cycle times, which are in fact random variables. In this paper, we present a distributionally robust release planning model that allows planned lead time probability estimates to vary over a specified ambiguity set. We evaluate the performance of non-robust and robust approaches using a simulation model of a scaled-down wafer fabrication facility. We examine the effect of increasing uncertainty in the estimated lead time parameters on the objective function value and compare the worst-case, average optimality, and feasibility of the two approaches. The numerical results show that the average objective function value of the robust solutions are better than that of the nominal solution by a margin of almost 20% in the scenario with the highest uncertainty level.

Date

Description

Journal or Series

2019 Winter Simulation Conference (WSC)

ISSN

0891-7736

ISBN

978-1-7281-3283-9

Keywords

Citation

Publisher

IEEE

Endorsement

Review

Supplemented By

Referenced By

Rights and licensing

restrictedAccess

Related Patent

Related Goal

Google Scholar
Scholar'da Ara ↗
Altmetric
Dimensions
PlumX Metrikleri
BIP! Indicators