An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronic
(2017-08)
Vestel Electronics produces LCD/LED televisions and has a significant market share in consumer electronics sector in Europe. TV manufacturing is planned based on a make-to order strategy, and Vestel uses 15 assembly lines ...
Facility location with supplier selection under quantity discount
(2017-07)
The purpose of this study is to identify the locations of distribution facilities and choose the suppliers in a two echelon system where items are purchased from suppliers under quantity discount policy and distributed to ...
Robust scheduling for parallel machines with sequence dependent setup times and uncertain breakdowns
(2017-08)
In this study, machine scheduling activities in the plastic injection production facility of a company competing in electronic sector is investigated. The company designs the products and picks order from customers for ...
Simultaneous lot sizing, scheduling workforce, overtime and shift planning MIP model including setup times and backlogging decisions
(2017-12)
Studies focusing on simultaneous lot sizing and scheduling problems, discard the effect of workforce constraints and tactical level decisions such as overtime and selected number of shifts. Generally, in production planning, ...
Solving a modified TSP problem by a greedy heuristic for cost minimization
(2017-06)
Photographing a large area in an instant is only made possible by satellites. Satellites are able to help reducing the time required for the photographing/monitoring process, however, satellite images are not available all ...
Transportation planning for the relief items distribution during an emergency
(2017-01)
We study the inventory slack routing problem (ISRP) to improve planning of distribution of the relief supplies, which is a critical issue in emergency preparedness and response. The authority officials construct their ...