Comparison of blast analysis methods for modular steel structures
(Turkish Chamber of Civil Engineers, 2018-03)
Two blast analysis methods widely used are three-dimensional finite element (FE) and uncoupled equivalent single degree of freedom (ESDOF) methods. The uncoupled equivalent ESDOF method, which is the most common blast ...
Site response from Istanbul vertical arrays and strong motion network
(Earthquake Engineering Research Institute ( EERI ), 2014)
In the framework of Istanbul Microzonation Project for the European side, the investigated region was divided by a grid system of 250m×250m and site investigations were performed for each cell based on borings and in-situ ...
Micro-a-fluidics ELISA for rapid CD4 cell count at the point-of-care
(Nature, 2014-01-22)
HIV has become one of the most devastating pathogens in human history. Despite fast progress in HIV-related basic research, antiretroviral therapy (ART) remains the most effective method to save AIDS patients' lives. ...
End-of-life materials used as supplementary cementitious materials in the concrete industry
(MDPI, 2020-04)
A sustainable solution for the global construction industry can be partial substitution of Ordinary Portland Cement (OPC) by use of supplementary cementitious materials (SCMs) sourced from industrial end-of-life (EOL) ...
Community resilience-focused technical investigation of the 2016 Lumberton, North Carolina, flood: An interdisciplinary approach
(American Society of Civil Engineers, 2020-08-01)
In early October 2016, Hurricane Matthew crossed North Carolina as a Category 1 storm, with some areas receiving 0.38-0.46 m (15-18 in.) of rainfall on already saturated soil. The NIST-funded Center for Risk-Based Community ...
Yumuşak zeminler üzerinde dolgu inşasında temel zemini göçmesine dayalı tasarım yaklaşımı
(TMMOB İnşaat Mühendisleri Odası, 2019-09)
In order to tackle the difficulties encountered in embankment design and construction, a new design method for embankments on soft clays is proposed in this paper. The method approaches to the problem with the philosophy ...
A rule-based methodology for automated progress monitoring of construction activities: A case for masonry work
(International Council for Research and Innovation in Building and Construction, 2019)
The conventional approach that is used to monitor construction projects is to collect progress data from the construction site through visual investigation. This results in deficient and sometimes erroneous data, and leads ...
Identification of common data environment functions during construction phase of BIM-based projects
(Luxembourg Institute of Science and Technology, 2021-10)
The utilization of building information modeling (BIM) has been rapidly increasing in the last decade as it stimulates project constructability, quality, efficiency, and success. A well-structured and organized information ...
BIM execution plan based on BS EN ISO 19650‐1 and BS EN ISO 19650‐2 standards
(Istanbul Technical University, 2020)
The major requirement of architecture, engineering, and construction (AEC) industry is to effectively manage information gathered from different project stakeholders. A structured guideline requires for managing the process ...
Evaluating the impact of building envelope on energy performance: Cooling analyses
(Golden Light Publishing, 2022-03-31)
Buildings require a significant amount of energy for heating, cooling, and lighting. Hence, building energy performance has become one of the most important topics in the
architecture, engineering, and construction (AEC) ...