Search
Now showing items 1-2 of 2
A BIM-GIS integrated pre-retrofit model for building data mapping
(Springer Nature, 2016-10)
In response to rising energy costs and the impetus to reduce environmental impacts, upgrading the large building stock that is responsible for 40% of the total energy consumption to maximum energy efficiency is becoming ...
Completing the missing link in building design process: Enhancing post-occupancy evaluation method for effective feedback for building performance
(Elsevier, 2015-07)
This paper provides a review of the improvements in the evaluation of building performance and introduces a new method for post-occupancy evaluation (POE) to complete the missing link in the building design process. Existing ...
Share this page