Publication: Co-optimization of transmission maintenance scheduling and production cost minimization
dc.contributor.author | Poyrazoğlu, Göktürk | |
dc.contributor.author | Oh, H. | |
dc.contributor.department | Electrical & Electronics Engineering | |
dc.contributor.ozuauthor | POYRAZOĞLU, Göktürk | |
dc.date.accessioned | 2020-07-03T10:01:56Z | |
dc.date.available | 2020-07-03T10:01:56Z | |
dc.date.issued | 2019-08-01 | |
dc.description.abstract | Regular transmission maintenance is important to keep the infrastructure resilient and reliable. Delays providing on-time maintenance increase the forced outage rate of those assets, causing unexpected changes in the operating conditions and even catastrophic consequences, such as local blackouts. The current process of maintenance schedule is based on the transmission owners' choice, with the final decision of system operator about the reliability. The requests are examined on a first-come, first-served basis, which means a regular maintenance request may be rejected, delaying the tasks that should be performed. To incorporate optimization knowledge into the transmission maintenance schedule, this study focuses on the co-optimization of maintenance scheduling and the production cost minimization. The mathematical model co-optimizes generation unit commitment and line maintenance scheduling while maintaining N-1 reliability criterion. Three case studies focusing on reliability, renewable energy delivery, and service efficiency are conducted leading up to 4% production cost savings as compared to the business-as-usual approach. | en_US |
dc.description.version | Publisher version | en_US |
dc.identifier.doi | 10.3390/en12152931 | en_US |
dc.identifier.issue | 15 | en_US |
dc.identifier.scopus | 2-s2.0-85073704070 | |
dc.identifier.uri | http://hdl.handle.net/10679/6699 | |
dc.identifier.uri | https://doi.org/10.3390/en12152931 | |
dc.identifier.volume | 12 | en_US |
dc.identifier.wos | 000482174800091 | |
dc.language.iso | eng | en_US |
dc.peerreviewed | yes | en_US |
dc.publicationstatus | Published | en_US |
dc.publisher | MDPI | en_US |
dc.relation.ispartof | Energies | |
dc.relation.publicationcategory | International Refereed Journal | |
dc.rights | openAccess | |
dc.subject.keywords | Outage scheduling | en_US |
dc.subject.keywords | Transmission topology control | en_US |
dc.subject.keywords | Unit commitment | en_US |
dc.subject.keywords | N-1 reliability | en_US |
dc.title | Co-optimization of transmission maintenance scheduling and production cost minimization | en_US |
dc.type | article | en_US |
dspace.entity.type | Publication | |
relation.isOrgUnitOfPublication | 7b58c5c4-dccc-40a3-aaf2-9b209113b763 | |
relation.isOrgUnitOfPublication.latestForDiscovery | 7b58c5c4-dccc-40a3-aaf2-9b209113b763 |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Co-optimization of transmission maintenance scheduling and production cost minimization.pdf
- Size:
- 4.17 MB
- Format:
- Adobe Portable Document Format
- Description:
License bundle
1 - 1 of 1
- Name:
- license.txt
- Size:
- 1.45 KB
- Format:
- Item-specific license agreed upon to submission
- Description: