<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Publication:
Purchasing and remanufacturing decisions with different quality returned material and finished goods

dc.contributor.authorKarabag, O.
dc.contributor.authorKaraesmen, F.
dc.contributor.authorTan, Baris
dc.contributor.departmentIndustrial Engineering
dc.contributor.ozuauthorTAN, Barış
dc.date.accessioned2025-09-03T12:45:23Z
dc.date.available2025-09-03T12:45:23.895Z
dc.date.issued2025-01-01
dc.description.abstractTo transition from a linear to a circular value chain, an effective refurbishment policy is crucial to preserve material value and functionality at the end of a product's life-cycle. This study examines a refurbisher that processes first- and second-quality returned materials to produce first- and second-quality products in a make-to-stock system. The refurbisher makes purchasing decisions for the returned materials and determines whether to refurbish or remain idle, and if refurbishing, how to convert them into finished goods of varying quality. There are five refurbishment decisions (converting first-quality to first- or second-quality, second-quality to first- or second-quality, or no production) and two purchasing decisions for the materials. With production and arrival times modelled as exponential random variables, the optimal control problem is formulated as a Markovian Decision Process, using a long-run average profit criterion to identify optimal decisions. A linear programming approach is employed for numerical optimisation. Results show that the most profitable option based solely on sales prices, purchasing, and conversion costs may not be optimal. Instead, the optimal policy is influenced by per-unit profit differences, returned material availability, demand rates, and production times across various refurbishment scenarios.
dc.description.sponsorshipEuropean Union's Horizon 2020
dc.description.versionPublisher version
dc.identifier.doi10.1080/00207543.2025.2451419
dc.identifier.endpage4430
dc.identifier.issn0020-7543
dc.identifier.issue12
dc.identifier.scopus2-s2.0-85215602582
dc.identifier.startpage4413
dc.identifier.urihttps://doi.org/10.1080/00207543.2025.2451419
dc.identifier.urihttps://hdl.handle.net/10679/10908
dc.identifier.volume63
dc.identifier.wos001401599600001
dc.language.isoen
dc.peerreviewedyes
dc.publicationstatusPublished
dc.publisherTaylor & Francis
dc.relation.ispartofInternational Journal of Production Research
dc.relation.publicationcategoryInternational Refereed Journal
dc.rightsopenAccess
dc.rightsAttribution 4.0 International
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/
dc.subject.keywordsLinear programming
dc.subject.keywordsMarkov decision processes
dc.subject.keywordsRemanufacutring
dc.subject.keywordsRefurbishment
dc.subject.keywordsCircular economy
dc.titlePurchasing and remanufacturing decisions with different quality returned material and finished goods
dc.typearticle
dspace.entity.typePublication
dspace.relatedentity.typePerson
person.identifier.orcid0000-0002-2584-1020
relation.isOrgUnitOfPublication5dd73c02-fd2d-43e0-9a23-71bab9ae0b6b
relation.isOrgUnitOfPublication.latestForDiscovery5dd73c02-fd2d-43e0-9a23-71bab9ae0b6b

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Purchasing and remanufacturing decisions with different quality returned material and finished goods.pdf
Size:
2.92 MB
Format:
Adobe Portable Document Format