<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Publication:
Optimizing washing machine production at vestel: A matheuristic approach to planning and scheduling

dc.contributor.authorSeyfishishavan, Seyed Amin
dc.contributor.authorYanikoglu, Ihsan
dc.contributor.departmentIndustrial Engineering
dc.contributor.ozuauthorYANIKOĞLU, Ihsan
dc.contributor.ozugradstudentSeyfishishavan, Seyed Amin
dc.date.accessioned2025-10-01T21:30:09Z
dc.date.available2025-10-01T21:30:10.215Z
dc.date.issued2026-02-01
dc.description.abstractThis research presents an optimisation framework, developed with Vestel, a prominent white goods manufacturer, to enhance production planning in their washing machine factory. The proposed model simultaneously optimises decisions on lot sizing, machine scheduling, shift assignments, and workforce planning over a multi-period horizon, subject to constraints such as machine-part compatibility, setup times, capacity limits, and shift regulations, to minimise total cost while meeting demand. To address the computational complexity of the problem, we develop a tailored matheuristic algorithm that yields near-optimal solutions within practical computation times, enabling efficient solution of large-scale instances. In addition, an industry-inspired planning heuristic based on Vestel's practice is implemented as a baseline for benchmarking. The results of the case study demonstrate that the proposed approach achieves up to 19% cost savings compared to the Vestel-inspired heuristic, while delivering solutions with total costs within a few percent of those obtained by a commercial solver. Moreover, unlike the solver, which frequently fails to return feasible solutions for longer horizons, the matheuristic reliably generates high quality solutions across tested dimensions, underscoring both its computational efficiency and scalability. These findings highlight the practical applicability of the integrated model and matheuristic for complex production planning problems in industrial settings.
dc.description.sponsorshipTÜBİTAK
dc.identifier.doi10.1080/00207543.2025.2559135
dc.identifier.endpage871
dc.identifier.issn0020-7543
dc.identifier.issue3
dc.identifier.scopus2-s2.0-105017019172
dc.identifier.startpage839
dc.identifier.urihttps://doi.org/10.1080/00207543.2025.2559135
dc.identifier.urihttps://hdl.handle.net/10679/11071
dc.identifier.volume64
dc.identifier.wos001577850500001
dc.language.isoen
dc.peerreviewedyes
dc.publicationstatusPublished
dc.publisherTaylor & Francis
dc.relation.ispartofInternational Journal of Production Research
dc.relation.projectinfo:eu-repo/grantAgreement/TUBITAK/2244 - Sanayi Doktora Programı/119C142
dc.relation.publicationcategoryInternational Refereed Journal
dc.rightsrestrictedAccess
dc.subject.keywordsMatheuristic
dc.subject.keywordsLot sizing
dc.subject.keywordsWorkforce scheduling
dc.subject.keywordsMachine scheduling
dc.subject.keywordsProduction planning
dc.titleOptimizing washing machine production at vestel: A matheuristic approach to planning and scheduling
dc.typearticle
dspace.entity.typePublication
dspace.relatedentity.typePerson
person.identifier.orcid0000-0002-7216-4739
relation.isOrgUnitOfPublication5dd73c02-fd2d-43e0-9a23-71bab9ae0b6b
relation.isOrgUnitOfPublication.latestForDiscovery5dd73c02-fd2d-43e0-9a23-71bab9ae0b6b

Files