Publication:
Practical electrical energy production to solve the shortage in electricity in Palestine and Pay Back period

dc.contributor.authorBadawi, A. S. A.
dc.contributor.authorHasbullah, N. F.
dc.contributor.authorYusoff, S.
dc.contributor.authorHashim, A.
dc.contributor.authorElamassie, Mohammed
dc.contributor.ozugradstudentElamassie, Mohammed
dc.date.accessioned2020-10-21T13:09:49Z
dc.date.available2020-10-21T13:09:49Z
dc.date.issued2019
dc.description.abstractIn this paper power energy had been estimated based on actual wind speed records in a coastal city in Palestine Ashdod. The main aims of this study to determine the feasibility of wind turbine and to estimate payback period. Therefore, to encourage investment in renewable energy in Palestine. The daily average wind speed data had been analyzed and fitted to the Weibull probability distribution function. The parameters of Weibull had been calculated by author using Graphical method the applied example wind turbine is 5kw wind turbine generator this is suitable turbine for small scale based on wind speed records on the coastal plain of Palestine. This study calculated the energy that can produce from wind turbine to estimate the revenue of any possible project in wind energy conversion system based on unit area. Energy has been calculated wind energy using two different method based on Weibull data and measured data. The total amount of energy for 2010 is 10749.8 kw.hr/m2 based on measured wind speed. Payback period for the project in wind energy turbines is around 3 years which make the generation electricity possible for small scale but not commercial. This study will lead to assess the wind energy production in Palestine to encourage investment in renewable energy sectors.en_US
dc.description.sponsorshipMinistry of Higher Education, Malaysia
dc.description.versionPublisher versionen_US
dc.identifier.doi10.11591/ijece.v9i6.pp4610-4616en_US
dc.identifier.endpage4616en_US
dc.identifier.issn2088-8708en_US
dc.identifier.issue6en_US
dc.identifier.scopus2-s2.0-85064510443
dc.identifier.startpage4610en_US
dc.identifier.urihttp://hdl.handle.net/10679/7034
dc.identifier.urihttps://doi.org/10.11591/ijece.v9i6.pp4610-4616
dc.identifier.volume9en_US
dc.language.isoengen_US
dc.peerreviewedyesen_US
dc.publicationstatusPublisheden_US
dc.publisherInstitute of Advanced Engineering and Scienceen_US
dc.relation.ispartofInternational Journal of Electrical and Computer Engineering
dc.relation.publicationcategoryInternational Refereed Journal
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subject.keywordsMean wind speeden_US
dc.subject.keywordsPotential energyen_US
dc.subject.keywordsWind energyen_US
dc.titlePractical electrical energy production to solve the shortage in electricity in Palestine and Pay Back perioden_US
dc.typeArticleen_US
dspace.entity.typePublication

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Practical electrical energy production to solve the shortage in electricity in Palestine and Pay Back period.pdf
Size:
759.42 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Placeholder
Name:
license.txt
Size:
1.45 KB
Format:
Item-specific license agreed upon to submission
Description: