<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Publication:
Practical electrical energy production to solve the shortage in electricity in Palestine and Pay Back period

dc.contributor.authorBadawi, A. S. A.
dc.contributor.authorHasbullah, N. F.
dc.contributor.authorYusoff, S.
dc.contributor.authorHashim, A.
dc.contributor.authorElamassie, Mohammed
dc.contributor.ozugradstudentElamassie, Mohammed
dc.date.accessioned2020-10-21T13:09:49Z
dc.date.available2020-10-21T13:09:49Z
dc.date.issued2019
dc.description.abstractIn this paper power energy had been estimated based on actual wind speed records in a coastal city in Palestine Ashdod. The main aims of this study to determine the feasibility of wind turbine and to estimate payback period. Therefore, to encourage investment in renewable energy in Palestine. The daily average wind speed data had been analyzed and fitted to the Weibull probability distribution function. The parameters of Weibull had been calculated by author using Graphical method the applied example wind turbine is 5kw wind turbine generator this is suitable turbine for small scale based on wind speed records on the coastal plain of Palestine. This study calculated the energy that can produce from wind turbine to estimate the revenue of any possible project in wind energy conversion system based on unit area. Energy has been calculated wind energy using two different method based on Weibull data and measured data. The total amount of energy for 2010 is 10749.8 kw.hr/m2 based on measured wind speed. Payback period for the project in wind energy turbines is around 3 years which make the generation electricity possible for small scale but not commercial. This study will lead to assess the wind energy production in Palestine to encourage investment in renewable energy sectors.
dc.description.sponsorshipMinistry of Higher Education, Malaysia
dc.description.versionPublisher version
dc.identifier.doi10.11591/ijece.v9i6.pp4610-4616
dc.identifier.endpage4616
dc.identifier.issn2088-8708
dc.identifier.issue6
dc.identifier.scopus2-s2.0-85064510443
dc.identifier.startpage4610
dc.identifier.urihttp://hdl.handle.net/10679/7034
dc.identifier.urihttps://doi.org/10.11591/ijece.v9i6.pp4610-4616
dc.identifier.volume9
dc.language.isoeng
dc.peerreviewedyes
dc.publicationstatusPublished
dc.publisherInstitute of Advanced Engineering and Science
dc.relation.ispartofInternational Journal of Electrical and Computer Engineering
dc.relation.publicationcategoryInternational Refereed Journal
dc.rightsopenAccess
dc.subject.keywordsMean wind speed
dc.subject.keywordsPotential energy
dc.subject.keywordsWind energy
dc.titlePractical electrical energy production to solve the shortage in electricity in Palestine and Pay Back period
dc.typearticle
dspace.entity.typePublication

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Practical electrical energy production to solve the shortage in electricity in Palestine and Pay Back period.pdf
Size:
759.42 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.45 KB
Format:
Item-specific license agreed upon to submission
Description: