Imperialist competitive algorithm for unrelated parallel machine scheduling with sequence-and-machine-dependent setups and compatibility and workload constraints

dc.contributor.authorCoban, Elvin
dc.contributor.authorOzener, O. Orsan
dc.contributor.authorSelcuk, Yagmur Selenay
dc.contributor.authorElyasi, Milad
dc.contributor.departmentIndustrial Engineering
dc.contributor.ozuauthorGÖKTÜRK, Elvin Çoban
dc.contributor.ozuauthorÖZENER, Okan Örsan
dc.contributor.ozugradstudentSelcuk, Yagmur Selenay
dc.contributor.ozugradstudentElyasi, Milad
dc.date.accessioned2025-06-26T11:10:12Z
dc.date.available2025-06-26T11:10:12.562Z
dc.date.issued2024-03
dc.description.abstractIn this paper, we present an in-depth analysis of the unrelated parallel machine scheduling problem (UPMSP) in the context of washing machine production at Vestel Electronics. Vestel Electronics is a leading producer of washing machines and holds a noteworthy market position in the European consumer electronics industry. The production process at Vestel Electronics is make-to-order (MTO) and requires 20 assembly lines to produce 200 different products. The decision maker must consider several important factors while forming the production schedule, including job-assembly line compatibility, the release times and due dates of the jobs, and a workload balance among the different assembly lines. This study aims to develop an algorithm to minimize the total earliness and tardiness while considering sequence-and-machine-dependent setups, unequal release times, machine -job compatibility restrictions, and workload balance requirements. To address this complex scheduling problem, we propose a novel algorithm, the imperialist competitive algorithm (ICA), which has a strong exploration-exploitation balance while mimicking real-world dynamics. Our numerical results show that the ICA significantly outperforms the current practice in Vestel by 39% and the best-performing algorithms in the literature by 23% and 12%.
dc.identifier.doi10.1016/j.cie.2024.110086
dc.identifier.issn0360-8352
dc.identifier.scopus2-s2.0-85188710439
dc.identifier.urihttps://doi.org/10.1016/j.cie.2024.110086
dc.identifier.urihttps://hdl.handle.net/10679/10584
dc.identifier.volume190
dc.identifier.wos001223533000001
dc.language.isoen_US
dc.peerreviewedyes
dc.publicationstatusPublished
dc.publisherElsevier
dc.relation.ispartofComputers & Industrial Engineering
dc.relation.publicationcategoryInternational Refereed Journal
dc.rightsrestrictedAccess
dc.subject.keywordsSequence-and-machine-dependent setup times
dc.subject.keywordsMachine-job compatibility
dc.subject.keywordsMachine workload
dc.subject.keywordsUnrelated parallel machine scheduling
dc.subject.keywordsImperialist competitive algorithm
dc.titleImperialist competitive algorithm for unrelated parallel machine scheduling with sequence-and-machine-dependent setups and compatibility and workload constraints
dc.typearticle
dspace.entity.typePublication
dspace.relatedentity.typePerson
dspace.relatedentity.typePerson
person.identifier.orcid0000-0002-3818-1957
person.identifier.orcid0000-0002-9291-1877
relation.isOrgUnitOfPublication5dd73c02-fd2d-43e0-9a23-71bab9ae0b6b
relation.isOrgUnitOfPublication.latestForDiscovery5dd73c02-fd2d-43e0-9a23-71bab9ae0b6b

Files