Search
Now showing items 11-15 of 15
BIM execution plan based on BS EN ISO 19650‐1 and BS EN ISO 19650‐2 standards
(Istanbul Technical University, 2020)
The major requirement of architecture, engineering, and construction (AEC) industry is to effectively manage information gathered from different project stakeholders. A structured guideline requires for managing the process ...
Two-part bio-based self-healing repair agent for cement-based mortar
(International Center for Numerical Methods in Engineering, 2020)
Factors affecting durability of concrete structures are generally associated with each other. Due to its brittle nature, concrete can crack under stress and these cracks are one of the main reasons for a decrease in service ...
Investigation of the extent of field data required for reliable calibration and validation of large scale traffic simulation models: A case study
(IEEE, 2020-09-20)
Availability, accuracy and relevance of field data are essential for developing a reliable simulation model. Large scale simulation models in particular require data from many sources and in great detail. Considering the ...
A computational workflow for rupture‐to‐structural‐response simulation and its application to Istanbul
(Wiley, 2020-10)
Scenario-based earthquake simulations at regional scales hold the promise in advancing the state-of-the-art in seismic risk assessment studies. In this study, a computational workflow is presented that combines (i) a ...
Effects of unbonded steel layout on seismic behavior of post-tensioned precast concrete shear walls
(Springer Nature, 2020-10)
Unbonded post-tensioned precast connections have been studied widely in various applications and shown to be promising seismic resisting systems with superior seismic performance including exceptional self-centering ...
Share this page