Economic lot sizing problem with tank scheduling
dc.contributor.author | Önal, Mehmet | |
dc.contributor.author | van den Heuvel, W. | |
dc.contributor.author | Dereli, Meryem Merve | |
dc.contributor.author | Albey, Erinç | |
dc.date.accessioned | 2023-08-17T11:41:59Z | |
dc.date.available | 2023-08-17T11:41:59Z | |
dc.date.issued | 2023-07-01 | |
dc.identifier.issn | 0377-2217 | en_US |
dc.identifier.uri | http://hdl.handle.net/10679/8712 | |
dc.identifier.uri | https://www.sciencedirect.com/science/article/abs/pii/S0377221722008761 | |
dc.description.abstract | We introduce a multiple-item economic lot sizing problem where items are produced through the fermentation of some raw materials. Fermentation takes place in specialized tanks that have finite capacities, and duration of the fermentation process is item dependent. When fermentation starts, the tanks are not available for the duration of the fermentation process. We analyze the complexity of this problem under various assumptions on the number of items and tanks. In particular, we show that several cases of the problem are (strongly) NP-hard, and we propose polynomial time algorithms to some single item cases. In addition, we propose a quick and simple heuristic approach for one of the multiple item cases. | en_US |
dc.language.iso | eng | en_US |
dc.publisher | Elsevier | en_US |
dc.relation.ispartof | European Journal of Operational Research | |
dc.rights | restrictedAccess | |
dc.title | Economic lot sizing problem with tank scheduling | en_US |
dc.type | Article | en_US |
dc.peerreviewed | yes | en_US |
dc.publicationstatus | Published | en_US |
dc.contributor.department | Özyeğin University | |
dc.contributor.authorID | (ORCID 0000-0002-0219-9581 & YÖK ID 37051) Önal, Mehmet | |
dc.contributor.authorID | (ORCID 0000-0001-5004-0578 & YÖK ID 144710) Albey, Erinç | |
dc.contributor.ozuauthor | Önal, Mehmet | |
dc.contributor.ozuauthor | Albey, Erinç | |
dc.identifier.volume | 308 | en_US |
dc.identifier.issue | 1 | en_US |
dc.identifier.startpage | 166 | en_US |
dc.identifier.endpage | 182 | en_US |
dc.identifier.wos | WOS:000992049400001 | |
dc.identifier.doi | 10.1016/j.ejor.2022.11.016 | en_US |
dc.subject.keywords | Complexity analysis | en_US |
dc.subject.keywords | Economic lot sizing | en_US |
dc.subject.keywords | Fermentation tank scheduling | en_US |
dc.subject.keywords | Production | en_US |
dc.identifier.scopus | SCOPUS:2-s2.0-85143509528 | |
dc.contributor.ozugradstudent | Dereli, Meryem Merve | |
dc.relation.publicationcategory | Article - International Refereed Journal - Institutional Academic Staff and Graduate Student |
Files in this item
Files | Size | Format | View |
---|---|---|---|
There are no files associated with this item. |
This item appears in the following Collection(s)
Share this page