Search
Now showing items 1-2 of 2
Load dependent lead time modelling: a robust optimization approach
(IEEE, 2018-01-04)
Although production planning models using nonlinear CFs have shown promising results for semiconductor wafer fabrication facilities, the lack of an effective methodology for estimating the CFs is a significant obstacle to ...
A robust optimization approach for production planning under exogenous planned lead times
(IEEE, 2019)
Many production planning models applied in semiconductor manufacturing represent lead times as fixed exogenous parameters. However, in reality, lead times must be treated as realizations of released lots' cycle times, which ...
Share this page