An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronic
(2017-08)
Vestel Electronics produces LCD/LED televisions and has a significant market share in consumer electronics sector in Europe. TV manufacturing is planned based on a make-to order strategy, and Vestel uses 15 assembly lines ...
A syncronized routing problem for restoring inter-dependent infrastructure networks
(2018-05)
Disasters may cause significant damages in lifeline infrastructure systems (such as gas, power, water) and lead to long-lasting failures. It is important to repair the damaged components and restore the affected infrastructures ...
An exact approach for a dynamic workforce scheduling problem
(2018-01)
Taking into account the global and national rules and regulations, assigning a given number of employees to planned shifts while paying attention to required working hours, rest times and off day/days is one of the most ...
Minimizing warpage using taguchian methodology and robust optimization
(2018-04)
Injection moulding, which is considered to be one of the most efficient plastic raw material processing methods in plastic industry regarding to its high production rate when manufacturing parts with complex geometries are ...
A real life operating room scheduling problem
(2015-08)
A real life operating room scheduling problem is studied using a data set from a leading hospital, Hospital X, in Turkey. After analyzing the real data, we solve daily operating room scheduling problems by mixed integer ...
Facility location with supplier selection under quantity discount
(2017-07)
The purpose of this study is to identify the locations of distribution facilities and choose the suppliers in a two echelon system where items are purchased from suppliers under quantity discount policy and distributed to ...
Robust scheduling for parallel machines with sequence dependent setup times and uncertain breakdowns
(2017-08)
In this study, machine scheduling activities in the plastic injection production facility of a company competing in electronic sector is investigated. The company designs the products and picks order from customers for ...
Creating an evacuation plan during an emergency by coordinating vehicles
(2018-10)
As disaster relief operations required quick and e ective service, especially evacuating victims from disaster area will be more problematic. In this paper, the problem is about evacuating the people who need service after ...
An exact approach to maximize area under receiver operator characteristic curve for multi-instance learning
(2018-08)
The purpose of this study is to solve the multi-instance classi cation problem by directly maximizing the area under Receiver Operating Characteristic (ROC) curve (i.e., AUC). We derive a mixed integer linear programming ...
Simultaneous lot sizing, scheduling workforce, overtime and shift planning MIP model including setup times and backlogging decisions
(2017-12)
Studies focusing on simultaneous lot sizing and scheduling problems, discard the effect of workforce constraints and tactical level decisions such as overtime and selected number of shifts. Generally, in production planning, ...