Search
Now showing items 1-3 of 3
A BIM-GIS integrated pre-retrofit model for building data mapping
(Springer Nature, 2016-10)
In response to rising energy costs and the impetus to reduce environmental impacts, upgrading the large building stock that is responsible for 40% of the total energy consumption to maximum energy efficiency is becoming ...
Completing the missing link in building design process: Enhancing post-occupancy evaluation method for effective feedback for building performance
(Elsevier, 2015-07)
This paper provides a review of the improvements in the evaluation of building performance and introduces a new method for post-occupancy evaluation (POE) to complete the missing link in the building design process. Existing ...
The use of building performance simulation tools in undergraduate program course training
(2015)
Not only in building construction industry, but also in
engineering and architectural education the use of
simulation tools has a great interest. Rapid advances in the capabilities of simulation tools and computer ...
Share this page